What the filing says
A public-record reading of the proposed work.
Herewith filing structural repair work of exterior masonry wall of the bulding. no change in use, egress or occupancy
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 1-story store building built in 1920, on a 10,209 sq ft lot.
- Built
- 1920
- Floors
- 1
- Residential units
- 0
- Building type
- Store building
- Land use
- Commercial and office
- Zoning district
- C4-4D
- Lot area
- 10,209 sq ft
- Building area
- 9,404 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 12, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 1 open notice on record for this building, out of 3 notices on file; the most recent was issued Apr 16, 2026.
- Construction
Issued Apr 16, 2026 — FTM BLDG IN A CODE COMPLIANT MANNER-OBSVD @ EXP4 TWO LARGE VERT CRACKS IN CMU BRICK MASONRY. AT EXP4 ALSO OBSVD CHAIN LINK FENCE ON THE ROOF FACING TOWARDS MORRIS AVE,LOOSE AND IN DISREPAIR. OWNER TO IMMED RETAIN NYSPE TO EVAL ENTIRE BLDG,PREPARE/FILE REPAIR DWGS, REPAIR BLDG UNDER PERMIT, START WORK BY 06/16/2026
A violation is a notice the Department of Buildings recorded against the building. It is not a judgment, and many concern paperwork rather than safety. Open means the agency has not recorded a resolution, which is not the same as the problem still existing. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing X01438004-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 18 days of being filed and a quarter take longer than 4 months, measured across 50,115 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- X01438004-I1
- BIN
- 2013956
- BBL
- 2031780060
- Postal code
- 10453 · 106 filings
- Review type
- Standard Plan Examination
- Existing stories
- 1
- Proposed stories
- 1
- Existing dwelling units
- 0
- Proposed dwelling units
- 0