What the filing says
A public-record reading of the proposed work.
Installation of temporary sidewalk shed as per plans. no change in use, egress or occupancy.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 2-story factory or industrial building built in 1932, on a 43,040 sq ft lot.
- Built
- 1932
- Last altered
- 1969
- Floors
- 2
- Residential units
- 0
- Building type
- Factory or industrial building
- Land use
- Industrial and manufacturing
- Zoning district
- M1-2
- Lot area
- 43,040 sq ft
- Building area
- 105,510 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Nov 22, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 3 open notices on record for this building, out of 23 notices on file; the most recent was issued Nov 19, 2025.
- Construction
Issued Nov 19, 2025 — FTM BLDG IN A CODE COMPLIANT MANNER-OBSVD MASONRY BULGING @ EXP3&4 AND SEVERAL CRACKED/LOOSE MASONRY @ MULT LOCATIONS.CRACKED GLASS WINDOWS, DETERIORATED MORTAR JOINTS & DAMAGED WINDOW LINTELS ALSO OBSVD @ MULT LOCATIONS. OWNER TO IMMED RETAIN NYSPE TO EVAL ENTIRE BLDG&PREPARE/ FILE REPAIR DWGS. REPAIR BLDG UNDER PERMIT START WORK BY 12/19/25
- Failure to submit
Issued Jun 23, 2024 — FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 - MULTIPLE YEARS (2023)
- Failure to submit
Issued Apr 22, 2023 — FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 IN 2022
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Nov 22, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing B01357576-I1.
- First permit date recorded02
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated03
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 23 days of being filed and a quarter take longer than 4 months, measured across 99,692 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- B01357576-I1
- BIN
- 3061645
- BBL
- 3023020006
- Postal code
- 11249 · 2234 filings
- Review type
- Professional Certification
- Existing stories
- 2
- Proposed stories
- 2
- Existing dwelling units
- 0
- Proposed dwelling units
- 0