What the filing says
A public-record reading of the proposed work.
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the NYC building code. live load 300psf.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 1-story health facility built in 1930, on a 17,535 sq ft lot.
- Built
- 1930
- Last altered
- 2004
- Floors
- 1
- Residential units
- 0
- Building type
- Health facility
- Land use
- Public facilities and institutions
- Zoning district
- M1-1
- Lot area
- 17,535 sq ft
- Building area
- 16,300 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 14, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 9 open notices on record for this building, out of 24 notices on file; the most recent was issued Sep 9, 2026.
- Construction
Issued Sep 9, 2026 — FTC W/COMMISSIONER'S ORDER CONTROL#370415 VIO#082726PI30901SB DATED 08/27/26 REQURING OWNER TO PROVIDE A CORRECTIVE ACTION PLAN BY 09/03/26. AS OF 09/09/26 THE REQ'D CAP WAS NOT REC'D. IMMED COMPLY W/ COMMISSIONER'S ORDER VIO#082726PI30901SB
- Construction
Issued Aug 27, 2026 — FTM BLDG IN A CODE COMPLIANT MANNER-OBSVD AT EXP1 THE PARAPET AT THE 1/2&1/4 CORNERS HAVE SEVERAL LOOSE BRICK MASONRY W/MISSING MORTAR JOINTS. AN ANNUAL PARAPET OBSERVATION REPORT IS REQ'D TO BE COMPLETED ANNUALLY STARTING IN 2025. SUBMIT ANNUAL PARAPET OBSERVATION REPORT FOR 2025 TO BE RE'C BY DOB NO LATER THAN 09/10/2026
- Construction
Issued Aug 27, 2026 — CORRECTION ACTION PLAN REQ'D-OBSVD @ EXP1 NEAR 1/2&1/4 PARAPET SEVERAL LOOSE BRICKS W/MISSING MORTAR JOINTS. ALSO AT EXP1 OBSVD SEVERAL CRACKED GLASS WINDOWS & A INCORRECTLY INSTALLED WATER TABLE. OWNER TO IMMED RETAIN REG DESIGN PROF IN GOOD STANDING W/DOB&NYS TO EVAL ENTIRE BLDG & SUBMIT A CORRECTIVE ACTION PLAN
6 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 13, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing B01454587-I1.
- First permit date recorded02
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated03
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 84,915 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- B01454587-I1
- BBL
- 3050570029
- Postal code
- 11226 · 2473 filings
- Review type
- Professional Certification
- Existing stories
- 1
- Proposed stories
- 1
- Existing dwelling units
- 0
- Proposed dwelling units
- 0