NYC DOB record · X01420924-I1

674 East 149 Street

674 East 149 Street, Bronx, NY 10455

Alteration filing in Mott Haven-Port Morris, Bronx. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 17, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · X01420924-I1

674 East 149 Street

Bronx, NY 10455

Alteration filing · status dated Sep 14, 2026

Current record
Approved
Proposed scale
20 stories
Dwelling units
231
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing X01420924-I1 as a alteration filing at 674 East 149 Street, Bronx, NY 10455. Its latest published status category is Approved, dated Sep 14, 2026. The filing records 20 proposed stories and 231 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Sep 14, 2026
Proposed scale
20 proposed stories and 231 proposed dwelling units
The building, not the filingopen housing violations, the owner of record and every filing at BIN 2091283Applicant of recordSee the 116 filings that name Lakhani & Jordan
FiledJul 8, 2026
Current recordApproved
Proposed scale20 stories
Recorded cost$5.1M

What the filing says

A public-record reading of the proposed work.

Back of house work includes all domestic water piping within first floor and cellar including all risers upstream of leak detection meters and all leak detection meters, as depicted on riser diagram and floor plans.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 20-story elevator apartment building built in 1963, with 463 homes, on a 125,000 sq ft lot.

Built
1963
Floors
20
Residential units
463
Building type
Elevator apartment building
Land use
Elevator apartments
Zoning district
R7-1
Lot area
125,000 sq ft
Building area
434,520 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 20, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 8 open notices on record for this building, out of 39 notices on file; the most recent was issued Feb 22, 2023.

  • No report and / or late filing (facade)

    Issued Feb 22, 2023 — FAILED TO FILE FISP CYCLE 9B TECHNICAL REPORT BY 2/21/2023

  • No report and / or late filing (facade)

    Issued Jul 31, 2018 — FAILED TO FILE FISP CYCLE 8B TECHNICAL REPORT BY 02/21/2018

  • Local law 11/98 - facade

    Issued Feb 10, 2014 — CYCLE 7 UNSAFE REPORT FILED

  • 5 further open notices are on file. Open the source dataset for the full list.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 20, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing X01420924-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “Permit Entire.”

    04

For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 66,351 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
X01420924-I1
BBL
2025570083
Review type
Standard Plan Examination
Existing stories
20
Proposed stories
20
Existing dwelling units
231
Proposed dwelling units
231