What the filing says
A public-record reading of the proposed work.
Heavy duty sidewalk shed during emergency conditions per ac 105.4.1, filed sep. sidewalk shed shall comply with ch #33 of the NYC bc. no change in use, occupancy or egress under this application.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 5-story store building built in 1849, with 5 homes, on a 5,860 sq ft lot.
- Built
- 1849
- Last altered
- 1964
- Floors
- 5
- Residential units
- 5
- Building type
- Store building
- Land use
- Mixed residential and commercial
- Zoning district
- M1-5
- Lot area
- 5,860 sq ft
- Building area
- 29,300 sq ft
- Historic district
- Gansevoort Market Historic District
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 16, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 3 open notices on record for this building, out of 37 notices on file; the most recent was issued May 19, 2015.
- Elevator
Issued May 19, 2015
- Construction
Issued Aug 16, 1993
- Construction
Issued Aug 16, 1993
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 7, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M00895435-I1.
- First permit date recorded02
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated03
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 81,398 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M00895435-I1
- BBL
- 1006290001
- Postal code
- 10014 · 742 filings
- Review type
- Professional Certification
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- 5
- Proposed dwelling units
- 5