NYC DOB record · B00228644-I1

676 Flushing Avenue

676 Flushing Avenue, Brooklyn, NY 11206

Alteration filing in Bedford-Stuyvesant (West), Brooklyn. The latest DOB status is loc issued.

DOB has issued a Letter of Completion, which records that the work in this filing is finished.

Recorded as completedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 11, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · B00228644-I1

676 Flushing Avenue

Brooklyn, NY 11206

Alteration filing · status dated Dec 27, 2020

Current record
Recorded as completed
Proposed scale
3 stories
Dwelling units
1
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing B00228644-I1 as a alteration filing at 676 Flushing Avenue, Brooklyn, NY 11206. Its latest published status category is Recorded as completed, dated Dec 27, 2020. The filing records 3 proposed stories and 1 proposed dwelling unit.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Recorded as completed
Latest status date
Dec 27, 2020
Proposed scale
3 proposed stories and 1 proposed dwelling unit
Complete building dossierView all 5 filings associated with BIN 3048324Applicant of recordSee the 33 filings that name Kce Consulting Engineering PLLC
FiledOct 1, 2019
Current recordRecorded as completed
Proposed scale3 stories
Recorded cost$25,000

What the filing says

A public-record reading of the proposed work.

Installation of temporary shoring and the installation of new wood joists and reinforcing existing steel lintel at the rear wall of the building as indicated on the drawings filed herein.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing B00228644-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Sign-off date recorded

    DOB lists a sign-off date for this filing.

    04
  5. Current status updated

    The latest recorded filing status is “LOC Issued.”

    05

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
B00228644-I1
BBL
3017220019
Review type
Standard Plan Examination
Existing stories
3
Proposed stories
3
Existing dwelling units
1
Proposed dwelling units
1
Structural work