NYC DOB record · B01438106-I1

679 4 Avenue

679 4 Avenue, Brooklyn, NY 11232

Alteration filing in Sunset Park (West), Brooklyn. The latest DOB status is approved.

A plan examiner has approved the application. A permit still has to be issued before work can begin. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Nov 6, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · B01438106-I1

679 4 Avenue

Brooklyn, NY 11232

Alteration filing · status dated Nov 4, 2026

Current record
Approved
Proposed scale
Not stated
Dwelling units
22
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing B01438106-I1 as a alteration filing at 679 4 Avenue, Brooklyn, NY 11232. Its latest published status category is Approved, dated Nov 4, 2026. The filing records 22 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Nov 4, 2026
Proposed scale
22 proposed dwelling units
Applicant of recordSee the 112 filings that name Scherer Design Group
FiledOct 14, 2026
Current recordApproved
Proposed scale22 units
Recorded cost$66,900

What the filing says

A public-record reading of the proposed work.

Installation of new VERIZON site on the roof. Install 3 sectors (12 antennas) with associated parts, 6 RRH units, 6 OVP's, 2 GPS antennas and 2 equipment cabinets.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing B01438106-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. Current status updated

    The latest recorded filing status is “Approved.”

    03

For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 92,577 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
B01438106-I1
BIN
3397575
BBL
3006437506
Review type
Standard Plan Examination
Existing stories
Empty in the source
Proposed stories
Empty in the source
Existing dwelling units
22
Proposed dwelling units
22