NYC DOB record · X01298536-I1

68 West 238 Street

68 West 238 Street, Bronx, NY 10463

Alteration filing in Kingsbridge Heights-Van Cortlandt Village, Bronx. The latest DOB status is loc issued.

DOB has issued a Letter of Completion, which records that the work in this filing is finished. What every status means

Recorded as completedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 12, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · X01298536-I1

68 West 238 Street

Bronx, NY 10463

Alteration filing · status dated Sep 8, 2026

Current record
Recorded as completed
Proposed scale
Not stated
Dwelling units
117
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing X01298536-I1 as a alteration filing at 68 West 238 Street, Bronx, NY 10463. Its latest published status category is Recorded as completed, dated Sep 8, 2026. The filing records 117 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Recorded as completed
Latest status date
Sep 8, 2026
Proposed scale
117 proposed dwelling units
Applicant of recordSee the 150 filings that name Mje Professional Services
FiledOct 7, 2025
Current recordRecorded as completed
Proposed scale117 units
Recorded cost$7,000

What the filing says

A public-record reading of the proposed work.

Proposed installation of temporary pipe scaffold as per plans. work shall comply with chapter #33 of the NYC building code. no change in use, occupancy, or egress under this application.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 6-story walk-up apartment building built in 1927, with 116 homes, on a 40,920 sq ft lot.

Built
1927
Last altered
1983
Floors
6
Residential units
116
Building type
Walk-up apartment building
Land use
Mixed residential and commercial
Zoning district
R6A
Lot area
40,920 sq ft
Building area
153,954 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 12, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 3 open notices on record for this building, out of 17 notices on file; the most recent was issued Feb 1, 2025.

  • Construction

    Issued Feb 1, 2025 — EWO DUE TO CRACKD/SPALLIN/BULGIN BRICK @ EXP2 EAST (SEDGWICK AVE) PARA PET HAS SPALLIN BRICK, BRICKS PUSHIN OF WINDOWS LINTELS @ BOTH NTH/STH FACIN WALLS.REMDY:IMMEDLY TAKE & PROVIDE SAFTY MEAS TO SECURE & PROTCT THE PBLIC & INSTALL PBLIC PROTCTIN @ EXP 2 ALONG SEDGWICK AVE. IMMEDLY MAKE REPAIRS TO DEFECTIVE CONDITIONS UNDR THE F/T SUPERV OF NY LP

  • Construction

    Issued Feb 1, 2025 — EWO DUE TO CRACKED/SPALLING BULGING BRICK @ EXP2 EAST (SEDYWICK AVE) PARAPET HAS SPALLING BRICK, BRICKS PUSHING OFF WINDOW LINTELS @ BOTH NORTH/SOUTH FACING WALLS. REMEDY:IMMEDLY TAKE/PROVIDE SAFETY MEAS TO SECURE/PROTECT THE PUBLIC & INSTALL PUBLIC PROTECTN @ EXP2 EAST ALONG SEDWICK AVE. MAKE REPAIRS TO DEFECTIVE CONDIT UNDR F/T SUPRV OF NYS LP

  • Low pressure boiler

    Issued Jun 20, 2023 — VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing X01298536-I1.

    01
  2. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    02
  3. Current status updated

    The latest recorded filing status is “LOC Issued.”

    03
  4. Sign-off date recorded

    DOB lists a sign-off date for this filing.

    04

For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 74,561 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
X01298536-I1
BIN
2092463
BBL
2032580190
Review type
Professional Certification
Existing stories
Empty in the source
Proposed stories
Empty in the source
Existing dwelling units
117
Proposed dwelling units
117
Scaffolding