NYC DOB record · S01147603-S3

689 Oakland Avenue

689 Oakland Avenue, Staten Island, NY 10310

New building filing in West New Brighton-Silver Lake-Grymes Hill, Staten Island. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedNew building

NYC Department of Buildings · w9ak-ipjd · accessed Oct 2, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · S01147603-S3

689 Oakland Avenue

Staten Island, NY 10310

New building · status dated Sep 29, 2026

Current record
Approved
Proposed scale
3 stories
Dwelling units
1
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing S01147603-S3 as a new building at 689 Oakland Avenue, Staten Island, NY 10310. Its latest published status category is Approved, dated Sep 29, 2026. The filing records 3 proposed stories and 1 proposed dwelling unit.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
New building
Latest status
Approved
Latest status date
Sep 29, 2026
Proposed scale
3 proposed stories and 1 proposed dwelling unit
The building, not the filingEvery filing at BIN 5176941, with the parcel and violation recordApplicant of recordSee the 80 filings that name C&p Design Consultants
FiledApr 22, 2026
Current recordApproved
Proposed scale3 stories
Recorded costNot published

What the filing says

A public-record reading of the proposed work.

Installation of new HVAC system associated with nb application filed under initial filing

Street Futures classifies this record as a new building based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 2-story one-family home built in 2026, on a 4,000 sq ft lot.

Built
2026
Floors
2
Residential units
1
Building type
One-family home
Land use
One and two family homes
Zoning district
R2
Lot area
4,000 sq ft
Building area
2,998 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 2, 2026. They describe the tax lot, not this filing.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing S01147603-S3.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “Permit Entire.”

    04

For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 73,707 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
S01147603-S3
BBL
Empty in the source
Review type
Professional Certification
Existing stories
Empty in the source
Proposed stories
3
Existing dwelling units
Empty in the source
Proposed dwelling units
1