What the filing says
A public-record reading of the proposed work.
Hereby filing for the interior renovation of unit 2f. no change in use, egress or occupancy.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a condominium built in 1958, with 119 homes, on a 10,655 sq ft lot.
- Built
- 1958
- Residential units
- 119
- Building type
- Condominium
- Land use
- Mixed residential and commercial
- Zoning district
- C4-5
- Lot area
- 10,655 sq ft
- Building area
- 104,556 sq ft
- Historic district
- Greenwich Village Historic District
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 12, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 8 open notices on record for this building, out of 41 notices on file; the most recent was issued May 7, 2024.
- Landmark
Issued May 7, 2024
- Hazardous condition (facade)
Issued Feb 21, 2024 — CYCLE 9C UNSAFE REPORT FILED
- Low pressure boiler
Issued Apr 6, 2018 — VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT
5 further open notices are on file. Open the source dataset for the full list.
A violation is a notice the Department of Buildings recorded against the building. It is not a judgment, and many concern paperwork rather than safety. Open means the agency has not recorded a resolution, which is not the same as the problem still existing. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 11, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M01296866-I1.
- Current status updated02
The latest recorded filing status is “Plan Examiner Review.”
For scale: half of DOB filings are permitted within 18 days of being filed and a quarter take longer than 4 months, measured across 50,115 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M01296866-I1
- BBL
- 1005737502
- Postal code
- 10011 · 340 filings
- Review type
- Standard Plan Examination
- Existing stories
- 13
- Proposed stories
- 13
- Existing dwelling units
- 115
- Proposed dwelling units
- 115








