NYC DOB record · X01358459-S6

690 East Fordham Road

690 East Fordham Road, Bronx, NY 10458

New building filing in Belmont, Bronx. The latest DOB status is approved.

A plan examiner has approved the application. A permit still has to be issued before work can begin. What every status means

ApprovedNew building

NYC Department of Buildings · w9ak-ipjd · accessed Aug 24, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · X01358459-S6

690 East Fordham Road

Bronx, NY 10458

New building · status dated Aug 20, 2026

Current record
Approved
Proposed scale
13 stories
Dwelling units
92
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing X01358459-S6 as a new building at 690 East Fordham Road, Bronx, NY 10458. Its latest published status category is Approved, dated Aug 20, 2026. The filing records 13 proposed stories and 92 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
New building
Latest status
Approved
Latest status date
Aug 20, 2026
Proposed scale
13 proposed stories and 92 proposed dwelling units
FiledJul 9, 2026
Current recordApproved
Proposed scale13 stories
Recorded costNot published

What the filing says

A public-record reading of the proposed work.

Plumbing specifications filed in conjunction with gc application x01358459-i1

Street Futures classifies this record as a new building based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

Zoning district
C4-5D

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 18, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

No open violations are recorded for this building.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 17, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing X01358459-S6.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. Current status updated

    The latest recorded filing status is “Approved.”

    03

For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 74,561 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
X01358459-S6
BIN
2131250
BBL
Empty in the source
Review type
Standard Plan Examination
Existing stories
Empty in the source
Proposed stories
13
Existing dwelling units
Empty in the source
Proposed dwelling units
92