What the filing says
A public-record reading of the proposed work.
Structural work in conjunction with new building construction. NB Filed under 321590532.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a vacant land on a 60,000 sq ft lot.
- Residential units
- 0
- Building type
- Vacant land
- Land use
- Vacant land
- Zoning district
- M1-1
- Lot area
- 60,000 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 14, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 22 open notices on record for this building, out of 37 notices on file; the most recent was issued Jun 20, 2023.
- Low pressure boiler
Issued Jun 20, 2023 — VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION
- Non-residential elevator periodic
Issued Dec 17, 2021 — FAILURE TO PERFORM CATEGORY 5 INSPECTION
- Elevator annual inspection /
Issued Apr 5, 2019 — VIOLATION ISSUED TO ELEVATOR - FAILURE TO FILE CATEGORY 1 2017 INSPECTION/TEST
19 further open notices are on file. Open the source dataset for the full list.
A violation is a notice the Department of Buildings recorded against the building. It is not a judgment, and many concern paperwork rather than safety. Open means the agency has not recorded a resolution, which is not the same as the problem still existing. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing B00421803-I1.
- Application approved02
The application reached an approved status in the DOB record.
- Current status updated03
The latest recorded filing status is “Approved.”
For scale: half of DOB filings are permitted within 18 days of being filed and a quarter take longer than 4 months, measured across 50,115 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- B00421803-I1
- BBL
- 3011200019
- Postal code
- 11217 · 2156 filings
- Review type
- Standard Plan Examination
- Existing stories
- 42
- Proposed stories
- 42
- Existing dwelling units
- 682
- Proposed dwelling units
- 682