What the filing says
A public-record reading of the proposed work.
Installation of sidewalk shed and overhead protection as per plans. sidewalk shed live load will be 300 psf shall comply with chapter #33 of the 2014 code no change to use, egress or occupancy.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 3-story educational building built in 1931, with 5 homes, on a 34,464 sq ft lot.
- Built
- 1931
- Floors
- 3
- Residential units
- 5
- Building type
- Educational building
- Land use
- Public facilities and institutions
- Zoning district
- R6
- Lot area
- 34,464 sq ft
- Building area
- 59,799 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 14, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 13 open notices on record for this building, out of 19 notices on file; the most recent was issued Jun 30, 2023.
- Low pressure boiler
Issued Jun 30, 2023 — VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION
- Low pressure boiler
Issued Jun 20, 2023 — VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION
- Low pressure boiler
Issued Jun 20, 2023 — VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION
10 further open notices are on file. Open the source dataset for the full list.
A violation is a notice the Department of Buildings recorded against the building. It is not a judgment, and many concern paperwork rather than safety. Open means the agency has not recorded a resolution, which is not the same as the problem still existing. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing B00374865-I1.
- First permit date recorded02
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated03
The latest recorded filing status is “LOC Issued.”
- Sign-off date recorded04
DOB lists a sign-off date for this filing.
For scale: half of DOB filings are permitted within 18 days of being filed and a quarter take longer than 4 months, measured across 50,115 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- B00374865-I1
- BIN
- 3032750
- BBL
- 3012630041
- Postal code
- 11213 · 1171 filings
- Review type
- Professional Certification
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- 7
- Proposed dwelling units
- 7