NYC DOB record · M01115055-I1

7 East 20 Street

7 East 20 Street, Manhattan, NY 10003

Alteration filing in Midtown South-Flatiron-Union Square, Manhattan. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 10, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · M01115055-I1

7 East 20 Street

Manhattan, NY 10003

Alteration filing · status dated Sep 8, 2026

Current record
Approved
Proposed scale
Not stated
Dwelling units
15
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing M01115055-I1 as a alteration filing at 7 East 20 Street, Manhattan, NY 10003. Its latest published status category is Approved, dated Sep 8, 2026. The filing records 15 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Sep 8, 2026
Proposed scale
15 proposed dwelling units
Complete building dossierView all 2 filings associated with BIN 1068277Applicant of recordSee the 141 filings that name Rigid Structural Design, LLC
FiledSep 27, 2024
Current recordApproved
Proposed scale15 units
Recorded cost$3,000

What the filing says

A public-record reading of the proposed work.

Installation of a temporarily Material hoist per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 12-story condominium built in 1907, with 15 homes, on a 4,600 sq ft lot.

Built
1907
Floors
12
Residential units
15
Building type
Condominium
Land use
Mixed residential and commercial
Zoning district
M1-5M
Lot area
4,600 sq ft
Building area
40,748 sq ft
Historic district
Ladies' Mile Historic District

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 10, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 10 open notices on record for this building, out of 56 notices on file; the most recent was issued Aug 4, 2026.

  • Construction

    Issued Aug 4, 2026 — PARTIAL VACATE ORDER DUE TO UNSAFE CONDITIONS AT MAIN ROOF LVL LEANING WATER TOWER AND DEFECTED WATER TANK DUNNAGE SUPPORT. AS OF DATE OF INSPECTION 7/20/26, THE CONDITIONS HAVE NOT BEEN REPAIRED. REMEDY: VACATE ALL OF MAIN ROOF

  • Elevator annual inspection /

    Issued Apr 5, 2019 — VIOLATION ISSUED TO ELEVATOR - FAILURE TO FILE CATEGORY 1 2017 INSPECTION/TEST

  • Local law 10/81 -

    Issued Oct 1, 2005

  • 7 further open notices are on file. Open the source dataset for the full list.

A violation is a notice the Department of Buildings recorded against the building. It is not a judgment, and many concern paperwork rather than safety. Open means the agency has not recorded a resolution, which is not the same as the problem still existing. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 10, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing M01115055-I1.

    01
  2. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    02
  3. Current status updated

    The latest recorded filing status is “Permit Entire.”

    03

For scale: half of DOB filings are permitted within 18 days of being filed and a quarter take longer than 4 months, measured across 50,115 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
M01115055-I1
BBL
1008497502
Review type
Professional Certification
Existing stories
Empty in the source
Proposed stories
Empty in the source
Existing dwelling units
15
Proposed dwelling units
15