What the filing says
A public-record reading of the proposed work.
Renovation of an apartment which includes the replacement of fixtures, associatedpiping, valves and components. refer to plumbing floor plans, riser diagrams andarchitectural drawing set for further information in regard to the scope of work.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a condominium built in 2004, with 34 homes, on a 19,282 sq ft lot.
- Built
- 2004
- Residential units
- 34
- Building type
- Condominium
- Land use
- Mixed residential and commercial
- Zoning district
- C6-2A
- Lot area
- 19,282 sq ft
- Building area
- 109,390 sq ft
- Historic district
- Tribeca West Historic District
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 25, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 1 open notice on record for this building, out of 3 notices on file; the most recent was issued Feb 22, 2022.
- No report and / or late filing (facade)
Issued Feb 22, 2022 — FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 24, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M01409542-S2.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 71,094 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M01409542-S2
- BBL
- 1002147503
- Postal code
- 10013 · 518 filings
- Review type
- Standard Plan Examination
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- 31
- Proposed dwelling units
- 31








