What the filing says
A public-record reading of the proposed work.
Installation of pipe scaffolding and heavy duty sidewalk shed, & plywood fence as per plans. temporary equipment shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 5-story place of public assembly built in 1891, on a 9,957 sq ft lot.
- Built
- 1891
- Last altered
- 2008
- Floors
- 5
- Residential units
- 1
- Building type
- Place of public assembly
- Land use
- Public facilities and institutions
- Zoning district
- C6-4.5
- Lot area
- 9,957 sq ft
- Building area
- 31,596 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 16, 2026. They describe the tax lot, not this filing.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M01379818-I1.
- First permit date recorded02
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated03
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 81,398 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M01379818-I1
- BBL
- 1012590029
- Postal code
- 10036 · 769 filings
- Review type
- Professional Certification
- Existing stories
- 5
- Proposed stories
- 5
- Existing dwelling units
- 2
- Proposed dwelling units
- 2








