NYC DOB record · M01290197-S1

7 West 81 Street

7 West 81 Street, Manhattan, NY 10024

Alteration filing in Upper West Side (Central), Manhattan. The latest DOB status is loc issued.

DOB has issued a Letter of Completion, which records that the work in this filing is finished. What every status means

Recorded as completedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 13, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · M01290197-S1

7 West 81 Street

Manhattan, NY 10024

Alteration filing · status dated Sep 10, 2026

Current record
Recorded as completed
Proposed scale
Not stated
Dwelling units
193
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing M01290197-S1 as a alteration filing at 7 West 81 Street, Manhattan, NY 10024. Its latest published status category is Recorded as completed, dated Sep 10, 2026. The filing records 193 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Recorded as completed
Latest status date
Sep 10, 2026
Proposed scale
193 proposed dwelling units
Complete building dossierView all 4 filings associated with BIN 1031141Applicant of recordSee the 2 filings that name Rodrigo Zamora Architect PLLC
FiledSep 26, 2025
Current recordRecorded as completed
Proposed scale193 units
Recorded cost$49,070

What the filing says

A public-record reading of the proposed work.

Replace 3 fixtures in existing bathroom

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 20-story elevator apartment building built in 1929, with 183 homes, on a 40,350 sq ft lot.

Built
1929
Last altered
1989
Floors
20
Residential units
183
Building type
Elevator apartment building
Land use
Elevator apartments
Zoning district
R10A
Lot area
40,350 sq ft
Building area
600,613 sq ft
Historic district
Upper West Side / Central Park West Historic District

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 13, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 3 open notices on record for this building, out of 137 notices on file; the most recent was issued Oct 10, 2019.

  • Construction

    Issued Oct 10, 2019 — FTM:AT SUB CELLAR LEVEL,CRACKS OBS.IN BRICK COLUMN ENCASEMENT@BASE OF MULTI STEEL COLUMNS,INDICAT CORROSSION OF STEEL COLUMNS.LARGE CRACK IN CONC IN VAC PUMP ROOM CRNR IN CONC WALL&SLABS HAVE SPALLS.PE EVAL ALL COND ABOVE&IMPLEMENT ANY IMMD SAFTY MEASURE.CMPL REPRS UNDER PRMTWITH FILING BY 12/23/19,WRK STRT BY 1/6/20 WRK CMPL UND PRMT&S/O BY 5/25/20

  • Construction

    Issued Oct 10, 2019 — FTM:IN VAULT SPACE AT CELLAR LEVEL.BELOW SIDE YARD ADJ TO 14 WEST 82 ST.IN ROOM DIRECTLY@BOTTOM OF STAIRS,STEP CRCKS WERE OBS.IN THE WEST& SOUTH BRICK WALLS,NEAR THE SOUTH WEST CRNR.PE IMMD EVAL STRUCT@SIDE YARD VAULT SPACE.CMPL PROBES&GEOTECH INVEST@DMG AREA.CMPL REPRSU/PRMT @DIR PE.FILE PRMT BY 12/2/19.OBT PMT&ST WRK BY 12/16/19 S/O BY 2/21/20

  • Elevator

    Issued Apr 12, 2013

A violation is a notice the Department of Buildings recorded against the building. It is not a judgment, and many concern paperwork rather than safety. Open means the agency has not recorded a resolution, which is not the same as the problem still existing. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing M01290197-S1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “LOC Issued.”

    04
  5. Sign-off date recorded

    DOB lists a sign-off date for this filing.

    05

For scale: half of DOB filings are permitted within 18 days of being filed and a quarter take longer than 4 months, measured across 50,115 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
M01290197-S1
BBL
1011950029
Review type
Standard Plan Examination
Existing stories
Empty in the source
Proposed stories
Empty in the source
Existing dwelling units
193
Proposed dwelling units
193