What the filing says
A public-record reading of the proposed work.
Propose interior renovation at partial cellar and 2nd floor of mixed used building as per plan. No change in use, egress, or occupancy.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 30-story condominium built in 1961, on a 19,982 sq ft lot.
- Built
- 1961
- Floors
- 30
- Residential units
- 0
- Building type
- Condominium
- Land use
- Commercial and office
- Zoning district
- C6-4
- Lot area
- 19,982 sq ft
- Building area
- 487,156 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Nov 6, 2026. They describe the tax lot, not this filing.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M01389381-I1.
- Current status updated02
The latest recorded filing status is “Plan Examiner Review.”
For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 95,944 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M01389381-I1
- BBL
- 1010167501
- Postal code
- 10036 · 1055 filings
- Review type
- Standard Plan Examination
- Existing stories
- 29
- Proposed stories
- 29
- Existing dwelling units
- 1332
- Proposed dwelling units
- 1332








