What the filing says
A public-record reading of the proposed work.
Filing herewith plans and application for plumbing fixtures to be filed for this 3 story 4 family dwelling unit. it is filed in conjunction with #321695750.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 3-story mainly residential with some commercial built in 1912, with 4 homes, on a 2,050 sq ft lot.
- Built
- 1912
- Floors
- 3
- Residential units
- 4
- Building type
- Mainly residential with some commercial
- Land use
- Mixed residential and commercial
- Zoning district
- R6
- Lot area
- 2,050 sq ft
- Building area
- 4,650 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 14, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 2 open notices on record for this building, out of 2 notices on file; the most recent was issued Nov 13, 2019.
- Construction
Issued Nov 13, 2019 — FAILURE TO MAINTAIN:3ST+C WOOD FRAME SEMI ATTACHED MIXED USE BLDG THAT SUSTAINED DAMAGE DUE TO FIRE ON 8/4/19.MODERATE FIRE DMG @ FIRST FLOOR DAMAGE SIDING AND WINDOWS AT FRONT WALL.DAMAGED AND MISSING WINDOWS AT REAR AND SIDE WALL.OWNER TO ENGAGE NYSPE TO EVALUATE ENTIRE BLDG AND REPAIR UNDER PERMIT.FILE FOR PERMIT BY 12/1/19.START WORK BY 1/1/19
- Construction
Issued Aug 4, 2019 — DUE TO FIRE
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing B00407091-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 76,126 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- B00407091-I1
- BIN
- 3079208
- BBL
- 3034210034
- Postal code
- 11207 · 3228 filings
- Review type
- Professional Certification
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- 4
- Proposed dwelling units
- 4