NYC DOB record · M01237783-I1

700 Fifth Avenue

700 Fifth Avenue, Manhattan, NY 10019

Alteration filing in Midtown-Times Square, Manhattan. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Nov 11, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · M01237783-I1

700 Fifth Avenue

Manhattan, NY 10019

Alteration filing · status dated Nov 6, 2026

Current record
Approved
Proposed scale
22 stories
Dwelling units
257
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing M01237783-I1 as a alteration filing at 700 Fifth Avenue, Manhattan, NY 10019. Its latest published status category is Approved, dated Nov 6, 2026. The filing records 22 proposed stories and 257 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Nov 6, 2026
Proposed scale
22 proposed stories and 257 proposed dwelling units
The building, not the filingwhat it sold for, apartment sizes, the owner of record and every filing at BIN 1034801Applicant of recordSee the 23 filings that name Rand Engineering & Architecture
FiledDec 19, 2025
Current recordApproved
Proposed scale22 stories
Recorded cost$526,500

What the filing says

A public-record reading of the proposed work.

Limited Structural Repair program to include work at Sidewalk, Cellar & Subcellar Vault spaces. No change to use, egress or occupancy.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 23-story hotel built in 1905, on a 12,552 sq ft lot.

Built
1905
Last altered
2008
Floors
23
Residential units
0
Building type
Hotel
Land use
Commercial and office
Zoning district
C5-3
Lot area
12,552 sq ft
Building area
252,405 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Nov 11, 2026. They describe the tax lot, not this filing.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing M01237783-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “Permit Entire.”

    04

For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 95,779 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
M01237783-I1
BBL
1012700038
Review type
Standard Plan Examination
Existing stories
22
Proposed stories
22
Existing dwelling units
257
Proposed dwelling units
257
General constructionStructural work