NYC DOB record · S01179482-I1

7140 Hylan Boulevard

7140 Hylan Boulevard, Staten Island, NY 10307

Alteration filing in Tottenville-Charleston, Staten Island. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 12, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · S01179482-I1

7140 Hylan Boulevard

Staten Island, NY 10307

Alteration filing · status dated Sep 9, 2026

Current record
Approved
Proposed scale
2 stories
Dwelling units
2
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing S01179482-I1 as a alteration filing at 7140 Hylan Boulevard, Staten Island, NY 10307. Its latest published status category is Approved, dated Sep 9, 2026. The filing records 2 proposed stories and 2 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Sep 9, 2026
Proposed scale
2 proposed stories and 2 proposed dwelling units
Complete building dossierView all 3 filings associated with BIN 5087921Applicant of recordSee the 1 filings that name Ah Architecture PLLC
FiledMay 9, 2025
Current recordApproved
Proposed scale2 stories
Recorded cost$140,000

What the filing says

A public-record reading of the proposed work.

Proposing work to address ecb violation 39134908r and DOB violation v101524c24-02744. work to include demolition of interior partitions, new sheetrock, new lighting fixtures, new 3-piece bathroom, new concrete steps and retaining wall and cellar entry.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 2-story two-family home built in 1980, on a 6,700 sq ft lot.

Built
1980
Floors
2
Residential units
2
Building type
Two-family home
Land use
One and two family homes
Zoning district
R3A
Lot area
6,700 sq ft
Building area
2,950 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 13, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 1 open notice on record for this building, out of 1 notice on file; the most recent was issued Oct 15, 2024.

  • Construction

    Issued Oct 15, 2024 — ALTERATIONS MADE TO BLDG FA ADE @ EXPO3 FOR NEW CELLAR ENTRY DOOR/CEMENT ACCESS STAIRS IN PLACE. OBSERVED INTERIOR PARTITIONS-DOORS-BX WIRING-SWITCHES-WALL OUTLETS-CEILING FIXTURES THROUGHOUT CELLAR. NEW FULL BATH & COPPER PLUMBING LINES FOR SINK,TOILET,SHOWER INSTALLED. DEPT RECORDS INDICATE NO PERMITS

A violation is a notice the Department of Buildings recorded against the building. It is not a judgment, and many concern paperwork rather than safety. Open means the agency has not recorded a resolution, which is not the same as the problem still existing. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 13, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing S01179482-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “Permit Entire.”

    04

For scale: half of DOB filings are permitted within 18 days of being filed and a quarter take longer than 4 months, measured across 50,115 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
S01179482-I1
BBL
5078860009
Review type
Standard Plan Examination
Existing stories
2
Proposed stories
2
Existing dwelling units
2
Proposed dwelling units
2
General constructionFoundation workEarthwork