NYC DOB record · M01012561-I1

715 Park Avenue

715 Park Avenue, Manhattan, NY 10021

Alteration filing in Upper East Side-Carnegie Hill, Manhattan. The latest DOB status is loc issued.

DOB has issued a Letter of Completion, which records that the work in this filing is finished. What every status means

Recorded as completedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 2, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · M01012561-I1

715 Park Avenue

Manhattan, NY 10021

Alteration filing · status dated Aug 28, 2026

Current record
Recorded as completed
Proposed scale
19 stories
Dwelling units
76
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing M01012561-I1 as a alteration filing at 715 Park Avenue, Manhattan, NY 10021. Its latest published status category is Recorded as completed, dated Aug 28, 2026. The filing records 19 proposed stories and 76 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Recorded as completed
Latest status date
Aug 28, 2026
Proposed scale
19 proposed stories and 76 proposed dwelling units
The building, not the filingwhat it sold for, apartment sizes, the owner of record and every filing at BIN 1042530Applicant of recordSee the 9 filings that name Donald Rubin, Architect LLC
FiledApr 1, 2024
Current recordRecorded as completed
Proposed scale19 stories
Recorded cost$150,000

What the filing says

A public-record reading of the proposed work.

Interior renovation to apartment 14B located on the 14th Floor , Remove and construct none load bearing parttiotions provide and install finishes all as per plan , no change in use egrees or occupancy

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 18-story condominium built in 1949, with 76 homes, on a 8,353 sq ft lot.

Built
1949
Floors
18
Residential units
76
Building type
Condominium
Land use
Mixed residential and commercial
Zoning district
R10
Lot area
8,353 sq ft
Building area
83,161 sq ft
Historic district
Upper East Side Historic District

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 2, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 5 open notices on record for this building, out of 37 notices on file; the most recent was issued Dec 1, 2021.

  • Failure to post energy

    Issued Dec 1, 2021 — FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3

  • Failure to post energy

    Issued Apr 29, 2021 — FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3

  • No report and / or late filing (facade)

    Issued May 31, 2018 — FAILED TO FILE FISP CYCLE 8A TECHNICAL REPORT BY 02/21/2017

  • 2 further open notices are on file. Open the source dataset for the full list.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing M01012561-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “LOC Issued.”

    04
  5. Sign-off date recorded

    DOB lists a sign-off date for this filing.

    05

For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 73,707 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
M01012561-I1
BBL
1014047501
Review type
Standard Plan Examination
Existing stories
19
Proposed stories
19
Existing dwelling units
76
Proposed dwelling units
76
General construction