What the filing says
A public-record reading of the proposed work.
Replace existing bathroom fixtures, install a wall-mounted electric hot water heater, and install suspended unit heaters as per drawings. No change in egress use or occupancy.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 1-story warehouse built in 1930, on a 4,040 sq ft lot.
- Built
- 1930
- Floors
- 1
- Residential units
- 0
- Building type
- Warehouse
- Land use
- Industrial and manufacturing
- Zoning district
- C8-2
- Lot area
- 4,040 sq ft
- Building area
- 2,400 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Nov 23, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 3 open notices on record for this building, out of 3 notices on file; the most recent was issued Jun 26, 2024.
- Construction
Issued Jun 26, 2024 — BUILDING CONSTRUCTED PRIOR TO 1930 ONE ALT-1 FOR CHANGE OF USE ON FILE NO WORK, OBSERVED ALL NEW ROOF JOISTS SIZED 12' X 5/4 X 6 INSTALLED AT 2FT ON CENTER, CEILING IS SAGGING & DEFLECTING NOTED BUILDING SIZE APPROX 24FT BY 80FT
- Construction
Issued Jun 14, 2024 — BUILDING CONSTRUCTED PRIOR TO 1930 ONE ALT-1 FOR CHANGE OF USE ON FILE NO WORK, OBSERVED ALL NEW ROOF JOISTS SIZED 12' X 5/4 X 6 INSTALLED AT 2FT ON CENTER THROUGH OUT ONE STORY COMMERCIAL BUILDING SIZE APPROX 24FT BY 80FT. NO WORK PERMIT ON FILE
- Construction
Issued Jun 14, 2024 — BUILDING CONSTRUCTED PRIOR TO 1930 ONE ALT-1 FOR CHANGE OF USE ON FILE NO WORK, OBSERVED ALL NEW ROOF JOISTS SIZED 12' X 5/4 X 6 INSTALLED AT 2FT ON CENTER THROUGH OUT ONE STORY COMMERCIAL BUILDING SIZE APPROX 24FT BY 80FT. NO WORK PERMIT ON FILE
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Nov 23, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing B00694372-S1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 23 days of being filed and a quarter take longer than 4 months, measured across 100,367 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- B00694372-S1
- BIN
- 3328431
- BBL
- 3053780028
- Postal code
- 11218 · 1786 filings
- Review type
- Professional Certification
- Existing stories
- 1
- Proposed stories
- 1
- Existing dwelling units
- 0
- Proposed dwelling units
- 0








