What the filing says
A public-record reading of the proposed work.
Application filed for interior renovation of non-load bearing partitions, ceilings, and finishes on the 54th floor (unit 54d) as per plans filed herewith. no change in use, egress, or occupancy
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 58-story condominium built in 1983, with 230 homes, on a 19,450 sq ft lot.
- Built
- 1983
- Floors
- 58
- Residential units
- 230
- Building type
- Condominium
- Land use
- Mixed residential and commercial
- Zoning district
- C5-3
- Lot area
- 19,450 sq ft
- Building area
- 626,594 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 4, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 14 open notices on record for this building, out of 327 notices on file; the most recent was issued Oct 23, 2019.
- Construction
Issued Oct 23, 2019 — BOROUGH COMMISSIONER HAS ISSUED A STOP WORK ORDER TO APPLICATION #140718640, DOB HAS NOT RECEIVED SUFFICIENT INFORMATION.
- Construction
Issued Jan 26, 2008
- Elevator
Issued Jan 14, 2008
11 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 3, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M01447066-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 62,630 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M01447066-I1
- BBL
- 1012927501
- Postal code
- 10022 · 447 filings
- Review type
- Professional Certification
- Existing stories
- 58
- Proposed stories
- 58
- Existing dwelling units
- 251
- Proposed dwelling units
- 251








