What the filing says
A public-record reading of the proposed work.
Application filed for interior renovations to an existing 4 story and cellar mixed use building, no change to use, egress or occupancy.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 4-story mainly residential with some commercial built in 1906, with 6 homes, on a 2,700 sq ft lot.
- Built
- 1906
- Floors
- 4
- Residential units
- 6
- Building type
- Mainly residential with some commercial
- Land use
- Mixed residential and commercial
- Zoning district
- R7A
- Lot area
- 2,700 sq ft
- Building area
- 7,308 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Nov 7, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 49 open notices on record for this building, out of 49 notices on file; the most recent was issued May 12, 2026.
- Construction
Issued May 12, 2026 — FAILURE TO COMPLY WITH COMMISSIONER'S ORDERS CONTAINED IN DOB VIOLATION #031826CE30801YU (CONTROL #376464) ISSUED ON 03/18/26 REMEDY: COMPLY WITH CODE. COMPLY WITH ALL REQUIREMENTS OF THE AFORMENTIONED COMMISSIONER'S ORDER BY 05/27/26 SUBMIT DOCUMENTS & CORRESPONDENCE TO : YONUH@BUILDINGS.NYC.GOV
- Construction
Issued Mar 18, 2026 — WORK CONTRARY 2 DRWGS; ROOF SUBSTRATE REMOVED & OPEN TO ELEMENT. CORNI CORNICE @ EXP 1 PARTLY DETACHED/COLLAPSED ON 3/12/26 AND REMOVED UNDER EMER WORK (VIO#031226CE30801YU). ENGINEERING ASSESSMENT IS REQD. REMDY :RETAIN NYS PE & SUBMIT SGND ENG RPTS BY 3/20/26 W/ PHOTOS, HAZARD ID, RESOLUTION PATH & GLOBAL STAB W/HANDS-ON FACADE
- Construction
Issued Mar 12, 2026 — EMER WORK-FAILURE TO MAINTAIN SAFE & CODE COMPLIANT. INT ALT SITE. ~25 FT CORNICE DETACHED & HANGING @ EXP 1; LOOSE DEBRIS IN FENCE. POTENTIA HAZARD TO PUBLIC, ADJ PROP & SITE. REMEDY: IMMED RETAIN NYS PE,CS & GC 2 TEMP STAB SITE, ADJ PROP & PUBLIC. SUBMIT SGND DOCS. FT PE/CS SUPVN DAILY RPTS & ENG RPT
46 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Nov 6, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing B01237283-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 93,320 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- B01237283-I1
- BBL
- 3011680053
- Postal code
- 11238 · 3091 filings
- Review type
- Standard Plan Examination
- Existing stories
- 4
- Proposed stories
- 4
- Existing dwelling units
- 8
- Proposed dwelling units
- 8








