What the filing says
A public-record reading of the proposed work.
Installation of temporary heavy duty sidewalk shed and pipe scaffold as per plans. no change in use, egress or occupancy.sidewalk shed shall comply with chapter #33 of 2022 the NYC building code.live load 300psf.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 7-story mainly residential with some commercial built in 1920, with 3 homes, on a 1,508 sq ft lot.
- Built
- 1920
- Last altered
- 1983
- Floors
- 7
- Residential units
- 3
- Building type
- Mainly residential with some commercial
- Land use
- Mixed residential and commercial
- Zoning district
- C6-6
- Lot area
- 1,508 sq ft
- Building area
- 9,831 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 10, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 3 open notices on record for this building, out of 12 notices on file; the most recent was issued Nov 14, 2025.
- Low pressure boiler
Issued Nov 14, 2025 — VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
- Low pressure boiler
Issued Sep 23, 2024 — VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION
- Construction
Issued May 30, 1997
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 9, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M01452032-I1.
- First permit date recorded02
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated03
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 66,747 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M01452032-I1
- BBL
- 1012630104
- Postal code
- 10036 · 466 filings
- Review type
- Professional Certification
- Existing stories
- 5
- Proposed stories
- 7
- Existing dwelling units
- 2
- Proposed dwelling units
- 2








