NYC DOB record · B00434194-S1

744 Bedford Avenue

744 Bedford Avenue, Brooklyn, NY 11205

Alteration filing in Bedford-Stuyvesant (West), Brooklyn. The latest DOB status is loc issued.

DOB has issued a Letter of Completion, which records that the work in this filing is finished. What every status means

Recorded as completedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 14, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · B00434194-S1

744 Bedford Avenue

Brooklyn, NY 11205

Alteration filing · status dated May 13, 2022

Current record
Recorded as completed
Proposed scale
Not stated
Dwelling units
Not stated
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing B00434194-S1 as a alteration filing at 744 Bedford Avenue, Brooklyn, NY 11205. Its latest published status category is Recorded as completed, dated May 13, 2022. The published record does not state proposed stories or dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Recorded as completed
Latest status date
May 13, 2022
Proposed scale
Not stated in this filing
Complete building dossierView all 9 filings associated with BIN 3426852Applicant of recordSee the 12 filings that name Cs Engineering
FiledJun 24, 2021
Current recordRecorded as completed
Proposed scaleNot specified
Recorded cost$540,550

What the filing says

A public-record reading of the proposed work.

Application filed herewith for sprinkler modification to exisitng sprinkler system in commercial space on cellar & basment floors with addtional new sprinkler heads in conjunction to general construction filed under bis #340782683

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 6-story condominium built in 2018, with 88 homes, on a 21,063 sq ft lot.

Built
2018
Last altered
2018
Floors
6
Residential units
88
Building type
Condominium
Land use
Mixed residential and commercial
Zoning district
M1-2/R6A
Lot area
21,063 sq ft
Building area
109,787 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 14, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 3 open notices on record for this building, out of 17 notices on file; the most recent was issued Dec 1, 2023.

  • Failure to post energy

    Issued Dec 1, 2023 — FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3

  • Failure to

    Issued Nov 2, 2023 — FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4

  • Failure to

    Issued Aug 2, 2023 — FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4

A violation is a notice the Department of Buildings recorded against the building. It is not a judgment, and many concern paperwork rather than safety. Open means the agency has not recorded a resolution, which is not the same as the problem still existing. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing B00434194-S1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “LOC Issued.”

    04
  5. Sign-off date recorded

    DOB lists a sign-off date for this filing.

    05

For scale: half of DOB filings are permitted within 18 days of being filed and a quarter take longer than 4 months, measured across 50,115 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
B00434194-S1
BBL
3018867507
Review type
Standard Plan Examination
Existing stories
Empty in the source
Proposed stories
Empty in the source
Existing dwelling units
0
Proposed dwelling units
0