What the filing says
A public-record reading of the proposed work.
Installation of 300psf sidewalk shed and pipe scaffolding as per plans. sidewalk shed and pipe scaffolding shall comply with chapter #33 of the 2022 code no change in use, egress or occupancy under this application.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 5-story walk-up apartment building built in 1929, with 20 homes, on a 2,437 sq ft lot.
- Built
- 1929
- Last altered
- 1986
- Floors
- 5
- Residential units
- 20
- Building type
- Walk-up apartment building
- Land use
- Walk-up apartments
- Zoning district
- R8B
- Lot area
- 2,437 sq ft
- Building area
- 9,470 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 25, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 2 open notices on record for this building, out of 3 notices on file; the most recent was issued Oct 2, 2025.
- Construction
Issued Oct 2, 2025 — FTC W/COMMISSIONER'S ORDER CONTROL@348156 VIO#081225PI10301HZ DATED 08/12/25 REQUIRING OWNER TO START BLDG REPAIRS UNDER PERMIT. AS OF 10/2/25 THERE ARE NO JOBS FILED IN BIS OR DOBNOW TO REPAIR THE BLDG IMMED COMPLY W/COMMISSIONER'S ORDER 348156 AND VIO# 081225PI10301HZ TO REPAIR BLDG UNDER PERMIT
- Construction
Issued Aug 12, 2025 — FTM BLDG IN CODE COMPLIANT MANNER-OBSVD SPALLING BROWNTONE MISSING MORTAR AROUND ORNAMENTAL STONE WORK,MISSING PARTS OF WINDOW SILLS ON 3FL & BRACKS OVER WINDOW IS MISSING MORTAR. OWNER TO IMMED RETAIN NYSP E TO EVAL THE ENTIRE BLDG TO DETERMINE THE STRUCT STAB&PREPARE/FILE REPAIR DWGS. REPAIR BLDG UNDER PERMIT START WORK BY 9/12/2025
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 24, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M01450713-I1.
- First permit date recorded02
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated03
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 70,325 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M01450713-I1
- BBL
- 1004490027
- Postal code
- 10003 · 519 filings
- Review type
- Professional Certification
- Existing stories
- 5
- Proposed stories
- 5
- Existing dwelling units
- 20
- Proposed dwelling units
- 20