NYC DOB record · B01454170-I1

767 Lincoln Avenue

767 Lincoln Avenue, Brooklyn, NY 11208

Alteration filing in East New York-City Line, Brooklyn. The latest DOB status is approved.

A plan examiner has approved the application. A permit still has to be issued before work can begin. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 19, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · B01454170-I1

767 Lincoln Avenue

Brooklyn, NY 11208

Alteration filing · status dated Sep 16, 2026

Current record
Approved
Proposed scale
17 stories
Dwelling units
294
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing B01454170-I1 as a alteration filing at 767 Lincoln Avenue, Brooklyn, NY 11208. Its latest published status category is Approved, dated Sep 16, 2026. The filing records 17 proposed stories and 294 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Sep 16, 2026
Proposed scale
17 proposed stories and 294 proposed dwelling units
Applicant of recordSee the 13 filings that name Curtis + Ginsberg Architects LLP
FiledSep 16, 2026
Current recordApproved
Proposed scale17 stories
Recorded cost$1,000

What the filing says

A public-record reading of the proposed work.

Interior renovation of apartment 14a to create an accessible model unit. no change to use, occupancy or egress.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

Violation record

Are there open violations here?

No open violations are recorded for this building. 7 notices are on file, all with a recorded resolution.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 21, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing B01454170-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. Current status updated

    The latest recorded filing status is “Approved.”

    03

For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 66,798 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
B01454170-I1
BIN
3398603
BBL
3042719001
Review type
Professional Certification
Existing stories
17
Proposed stories
17
Existing dwelling units
294
Proposed dwelling units
294
General construction