NYC DOB record · B01219611-I1

769 Macdonough Street

769 Macdonough Street, Brooklyn, NY 11233

Alteration filing in Ocean Hill, Brooklyn. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Nov 21, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · B01219611-I1

769 Macdonough Street

Brooklyn, NY 11233

Alteration filing · status dated Nov 18, 2026

Current record
Approved
Proposed scale
Not stated
Dwelling units
4
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing B01219611-I1 as a alteration filing at 769 Macdonough Street, Brooklyn, NY 11233. Its latest published status category is Approved, dated Nov 18, 2026. The filing records 4 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Nov 18, 2026
Proposed scale
4 proposed dwelling units
The building, not the filingopen housing violations, what it sold for and every filing at BIN 3040228Applicant of recordSee the 139 filings that name Prime Zone Building Consulting
FiledSep 25, 2025
Current recordApproved
Proposed scale4 units
Recorded cost$46,500

What the filing says

A public-record reading of the proposed work.

Plumbing work in conjunction with alt-2 job# b01394022-i1

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 4-story walk-up apartment building built in 1905, with 4 homes, on a 1,750 sq ft lot.

Built
1905
Floors
4
Residential units
4
Building type
Walk-up apartment building
Land use
Walk-up apartments
Zoning district
R6
Lot area
1,750 sq ft
Building area
4,200 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Nov 21, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 5 open notices on record for this building, out of 19 notices on file; the most recent was issued Sep 14, 2022.

  • Structurally compromised

    Issued Sep 14, 2022 — FAILURE TO SUBMIT AN ACCEPTABLE INSPECTN RPT FOR STRUCTURALLY COMPROMISED BLDG.

  • Construction

    Issued Oct 18, 2016 — FAILURE TO COMPLY WITH VACATE ORDER NOTE: AT TIME OF INSPECTION THE AB OVE PREMISES WAS STILL OCCUPIED CONTRARY TO VACET ORDER #302/16 ISSUED 6/20/16/REMEDY: COMPLY WITH VACATE ORDER

  • Construction

    Issued Sep 19, 2016 — FAILURE TO COMPLY WITH COMMISSIONERS ORDER DOB#062216FEU31601JH.THIS BLDG WAS SERVED WITH A COMMISSIONERS ORDER DATED 6/22/16 REQUIRING ENGAGEMENT OF A LIC PROF TO EVALUATE STRUCTURE AND PREPARE AND FILE DWGS TO EFFECT REPAIRS.THIS WORK WAS NOT DONE.REMEDY:COMPLY WITH COMMISSIONERS ORDER

  • 2 further open notices are on file. Open the source dataset for the full list.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Nov 20, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing B01219611-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “Permit Entire.”

    04

For scale: half of DOB filings are permitted within 23 days of being filed and a quarter take longer than 4 months, measured across 99,111 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
B01219611-I1
BBL
3014980054
Review type
Professional Certification
Existing stories
Empty in the source
Proposed stories
Empty in the source
Existing dwelling units
4
Proposed dwelling units
4