What the filing says
A public-record reading of the proposed work.
Removal of sprinkler heads and installation of temporary sprinkler loop on the 4th floors as indicated on drawings.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
Violation record
Are there open violations here?
The Department of Buildings has 9 open notices on record for this building, out of 235 notices on file; the most recent was issued Sep 2, 2025.
- Landmark
Issued Sep 2, 2025
- Landmark
Issued Sep 2, 2025
- Elevator
Issued Feb 15, 2008
6 further open notices are on file. Open the source dataset for the full list.
A violation is a notice the Department of Buildings recorded against the building. It is not a judgment, and many concern paperwork rather than safety. Open means the agency has not recorded a resolution, which is not the same as the problem still existing. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 13, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M00932665-P2.
- Current status updated02
The latest recorded filing status is “Plan Examiner Review.”
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M00932665-P2
- BBL
- 1005540001
- Postal code
- 10003 · 315 filings
- Review type
- Standard Plan Examination
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- 0
- Proposed dwelling units
- 0








