NYC DOB record · B00531279-I1

770 Fulton Street

770 Fulton Street, Brooklyn, NY 11238

Alteration filing in Fort Greene, Brooklyn. The latest DOB status is on hold – administrative action.

The filing is paused until an administrative step is completed. It has not been rejected. What every status means

Under reviewAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 22, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · B00531279-I1

770 Fulton Street

Brooklyn, NY 11238

Alteration filing · status dated Sep 17, 2026

Current record
Under review
Proposed scale
15 stories
Dwelling units
304
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing B00531279-I1 as a alteration filing at 770 Fulton Street, Brooklyn, NY 11238. Its latest published status category is Under review, dated Sep 17, 2026. The filing records 15 proposed stories and 304 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Under review
Latest status date
Sep 17, 2026
Proposed scale
15 proposed stories and 304 proposed dwelling units
The building, not the filingopen housing violations, the owner of record and every filing at BIN 3321980Applicant of recordSee the 25 filings that name Enthink Engineers LLC
FiledJun 1, 2021
Current recordUnder review
Proposed scale15 stories
Recorded cost$10,800

What the filing says

A public-record reading of the proposed work.

APPLICATION FILE TO INTERIOR RENOVATION EXISTING APT.# 6E AT 6th FLOOR AS MINOR SHEETROCK REPAIR, BEDROOMS WALL, BATHROOM WALLS REPAIR AND COSMETICS (PAINTING) WORK AS PER PLAN

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 15-story elevator apartment building built in 1974, with 304 homes, on a 125,150 sq ft lot.

Built
1974
Last altered
2007
Floors
15
Residential units
304
Building type
Elevator apartment building
Land use
Elevator apartments
Zoning district
R7-2
Lot area
125,150 sq ft
Building area
476,450 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 30, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 17 open notices on record for this building, out of 69 notices on file; the most recent was issued Nov 14, 2025.

  • Low pressure boiler

    Issued Nov 14, 2025 — VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION

  • Low pressure boiler

    Issued Nov 14, 2025 — VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION

  • Low pressure boiler

    Issued Jun 20, 2023 — VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION

  • 14 further open notices are on file. Open the source dataset for the full list.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 22, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing B00531279-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “On Hold – Administrative Action.”

    04

For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 73,707 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
B00531279-I1
BBL
3020070014
Review type
Professional Certification
Existing stories
15
Proposed stories
15
Existing dwelling units
304
Proposed dwelling units
304
General construction