NYC DOB record · X01095095-S2

778 Forest Avenue

778 Forest Avenue, Bronx, NY 10456

Alteration filing in Melrose, Bronx. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Nov 25, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · X01095095-S2

778 Forest Avenue

Bronx, NY 10456

Alteration filing · status dated Nov 23, 2026

Current record
Approved
Proposed scale
Not stated
Dwelling units
Not stated
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing X01095095-S2 as a alteration filing at 778 Forest Avenue, Bronx, NY 10456. Its latest published status category is Approved, dated Nov 23, 2026. The published record does not state proposed stories or dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Nov 23, 2026
Proposed scale
Not stated in this filing
The building, not the filingopen housing violations, the owner of record and every filing at BIN 2004690Applicant of recordSee the 41 filings that name Princeton Engineering Services, PC
FiledAug 23, 2024
Current recordApproved
Proposed scaleNot specified
Recorded cost$520,030

What the filing says

A public-record reading of the proposed work.

Replace existing (3) exhaust fan and lights associated with room 216, 218 and 227. Replace associated ductwork in room 227.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 4-story educational building built in 1974, on a 121,505 sq ft lot.

Built
1974
Floors
4
Residential units
0
Building type
Educational building
Land use
Public facilities and institutions
Zoning district
R6
Lot area
121,505 sq ft
Building area
237,210 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Nov 25, 2026. They describe the tax lot, not this filing.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing X01095095-S2.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “Permit Entire.”

    04

For scale: half of DOB filings are permitted within 23 days of being filed and a quarter take longer than 4 months, measured across 101,127 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
X01095095-S2
BBL
2026550030
Review type
Standard Plan Examination
Existing stories
Empty in the source
Proposed stories
Empty in the source
Existing dwelling units
0
Proposed dwelling units
0