NYC DOB record · B00782504-S1

778 Halsey Street

778 Halsey Street, Brooklyn, NY 11233

Alteration filing in Bedford-Stuyvesant (East), Brooklyn. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Nov 21, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · B00782504-S1

778 Halsey Street

Brooklyn, NY 11233

Alteration filing · status dated Nov 19, 2026

Current record
Approved
Proposed scale
3 stories
Dwelling units
3
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing B00782504-S1 as a alteration filing at 778 Halsey Street, Brooklyn, NY 11233. Its latest published status category is Approved, dated Nov 19, 2026. The filing records 3 proposed stories and 3 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Nov 19, 2026
Proposed scale
3 proposed stories and 3 proposed dwelling units
The building, not the filingEvery filing at BIN 3039990, with the parcel and violation recordApplicant of recordSee the 22 filings that name Frank S Caminiti, RA
FiledApr 5, 2023
Current recordApproved
Proposed scale3 stories
Recorded cost$25,000

What the filing says

A public-record reading of the proposed work.

Drawings are filed to relocate existing laundry area - washing machine and for installation of new toilet room and associated piping in the cellar only (related construction application number b00782504-i1). no change to egress, occupancy, or use group.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 3-story walk-up apartment building built in 1901, with 3 homes, on a 1,942 sq ft lot.

Built
1901
Floors
3
Residential units
3
Building type
Walk-up apartment building
Land use
Walk-up apartments
Zoning district
R6B
Lot area
1,942 sq ft
Building area
3,135 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Nov 21, 2026. They describe the tax lot, not this filing.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing B00782504-S1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “Permit Entire.”

    04

For scale: half of DOB filings are permitted within 23 days of being filed and a quarter take longer than 4 months, measured across 99,111 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
B00782504-S1
BBL
3014930003
Review type
Standard Plan Examination
Existing stories
3
Proposed stories
3
Existing dwelling units
3
Proposed dwelling units
3