NYC DOB record · M01018165-S3

78 Franklin Street

78 Franklin Street, Manhattan, NY 10013

Alteration filing in Tribeca-Civic Center, Manhattan. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 1, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · M01018165-S3

78 Franklin Street

Manhattan, NY 10013

Alteration filing · status dated Aug 27, 2026

Current record
Approved
Proposed scale
5 stories
Dwelling units
4
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing M01018165-S3 as a alteration filing at 78 Franklin Street, Manhattan, NY 10013. Its latest published status category is Approved, dated Aug 27, 2026. The filing records 5 proposed stories and 4 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Aug 27, 2026
Proposed scale
5 proposed stories and 4 proposed dwelling units
The building, not the filingwhat it sold for, apartment sizes, the owner of record and every filing at BIN 1001920Applicant of recordSee the 86 filings that name Silman
FiledJul 14, 2026
Current recordApproved
Proposed scale5 stories
Recorded cost$100,000

What the filing says

A public-record reading of the proposed work.

Structural modifications as per plans. no change to use, egress or occupancy.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 6-story mainly residential with some commercial built in 1868, with 5 homes, on a 2,508 sq ft lot.

Built
1868
Last altered
1983
Floors
6
Residential units
5
Building type
Mainly residential with some commercial
Land use
Mixed residential and commercial
Zoning district
C6-2A
Lot area
2,508 sq ft
Building area
15,563 sq ft
Historic district
Tribeca East Historic District

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 8, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 1 open notice on record for this building, out of 46 notices on file; the most recent was issued Mar 22, 2021.

  • Elevator

    Issued Mar 22, 2021

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 21, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing M01018165-S3.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “Permit Entire.”

    04

For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 66,747 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
M01018165-S3
BBL
1001750004
Review type
Standard Plan Examination
Existing stories
5
Proposed stories
5
Existing dwelling units
4
Proposed dwelling units
4
Structural work