What the filing says
A public-record reading of the proposed work.
1st floor commercial unit plumbing work filed in conjunction with interior renovation m01169557-i1.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 43-story condominium built in 2007, with 122 homes, on a 5,232 sq ft lot.
- Built
- 2007
- Floors
- 43
- Residential units
- 122
- Building type
- Condominium
- Land use
- Mixed residential and commercial
- Zoning district
- C6-4
- Lot area
- 5,232 sq ft
- Building area
- 97,076 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 23, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 2 open notices on record for this building, out of 62 notices on file; the most recent was issued May 25, 2021.
- Construction
Issued May 25, 2021 — FAILURE TO COMPLY WITH COMMISSIONER'S ORDER. ON 12/14/2017, COMMISSIONER'S ORDER 121417CLL104TDL01 WERE ISSUED TO OWNER TO HAVE 100% CURTAIN WALL/GLASS IMMED INSPECTED BY QEWI. AS OF 05/25/2021 OWNER HAS NOT COMPLIED WITH IMMED CURE ORDER TO HAVE ALL FACADED INSPECTED AND MADE SAFE. IMMED COM¢LY WITH CODE & COMMISSIONERS ORDER
- Elevator
Issued Mar 23, 2021
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 23, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M01169557-S1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 85,681 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M01169557-S1
- BBL
- 1010387501
- Postal code
- 10036 · 860 filings
- Review type
- Standard Plan Examination
- Existing stories
- 42
- Proposed stories
- 42
- Existing dwelling units
- 122
- Proposed dwelling units
- 122








