What the filing says
A public-record reading of the proposed work.
General construction exterior work for dryer vent, louver, exterior renovations & window replacements as per plans filed herewith. no change in use, egress or occupancy.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 18-story elevator apartment building built in 1963, with 66 homes, on a 13,229 sq ft lot.
- Built
- 1963
- Last altered
- 2017
- Floors
- 18
- Residential units
- 66
- Building type
- Elevator apartment building
- Land use
- Elevator apartments
- Zoning district
- R10H
- Lot area
- 13,229 sq ft
- Building area
- 163,221 sq ft
- Historic district
- Upper East Side Historic District
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 23, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 1 open notice on record for this building, out of 66 notices on file; the most recent was issued Apr 15, 2022.
- Construction
Issued Apr 15, 2022 — VACATE ORDER:DUE TO UNSTABLE MASONRY ARCH ON THE 18TH FLOOR OF 781 5TH AVENUE,PRESENTING HAZAROUS CONDITIONS BELOW.REMEDY:IMMEDIATELY VACATE ALL ROOF AREAS BELOW.PROVIDE AND MAINTAIN SAFETY MEASURES TO PREVENT ACCESS TO THE ROOF AREA BELOW
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 22, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M00848618-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “LOC Issued.”
- Sign-off date recorded05
DOB lists a sign-off date for this filing.
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 73,707 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M00848618-I1
- BBL
- 1013740069
- Postal code
- 10022 · 778 filings
- Review type
- Professional Certification
- Existing stories
- 18
- Proposed stories
- 18
- Existing dwelling units
- 65
- Proposed dwelling units
- 65