NYC DOB record · M01425710-I1

79 Mercer Street

79 Mercer Street, Manhattan, NY 10012

Alteration filing in Soho-Little Italy-Hudson Square, Manhattan. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Nov 25, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · M01425710-I1

79 Mercer Street

Manhattan, NY 10012

Alteration filing · status dated Nov 23, 2026

Current record
Approved
Proposed scale
6 stories
Dwelling units
4
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing M01425710-I1 as a alteration filing at 79 Mercer Street, Manhattan, NY 10012. Its latest published status category is Approved, dated Nov 23, 2026. The filing records 6 proposed stories and 4 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Nov 23, 2026
Proposed scale
6 proposed stories and 4 proposed dwelling units
Applicant of recordSee the 22 filings that name David Turner Architect PC
FiledJul 8, 2026
Current recordApproved
Proposed scale6 stories
Recorded cost$56,250

What the filing says

A public-record reading of the proposed work.

Modifications to partitions in second floor commercial space

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing M01425710-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “Permit Entire.”

    04

For scale: half of DOB filings are permitted within 23 days of being filed and a quarter take longer than 4 months, measured across 101,127 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
M01425710-I1
BIN
1007270
BBL
1004850029
Review type
Standard Plan Examination
Existing stories
6
Proposed stories
6
Existing dwelling units
4
Proposed dwelling units
4
General construction