What the filing says
A public-record reading of the proposed work.
Replace plumbing fixtures with new at existing roughing (42 wc, 42 lavs), cap & remove (42 tubs) and install new plumbing fixtures (42 showers) on the 20th floor.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 22-story hotel built in 1963, on a 33,266 sq ft lot.
- Built
- 1963
- Floors
- 22
- Residential units
- 0
- Building type
- Hotel
- Land use
- Commercial and office
- Zoning district
- C6-7
- Lot area
- 33,266 sq ft
- Building area
- 461,591 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 13, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 4 open notices on record for this building, out of 223 notices on file; the most recent was issued Mar 29, 2025.
- Construction
Issued Mar 29, 2025 — EWO OBSERVEDCRACKED/SPALLING CONCRETE SLAB WITH LOOSE MATERLS MULTI LVL WITH INADEQUATE SAFETY MEAS IN PLACE. CELLAR/1ST FL HAVE INADEQUAT SHORING/SHORING PROTECTION.REMEDY:RETAIN NYS RDP TO DIRECT/SUPERV/ THE IMMEDIATE INSTALLTN SAFETY MEASU CELLAR LVL 4,5,6(FL 1,2,3) & PROVIDE SHORING. RDP TO PROVIDE DAILY PROGRES REPORT TO PARKINGSTRUCTURE@B.N.G
- Failure to submit
Issued Jun 23, 2024 — FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 IN 2023
- (other bldgs types) - elevator affirmation of
Issued May 30, 2014 — VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2012 CAT 1 INSP/TST
1 further open notice is on file. Open the source dataset for the full list.
A violation is a notice the Department of Buildings recorded against the building. It is not a judgment, and many concern paperwork rather than safety. Open means the agency has not recorded a resolution, which is not the same as the problem still existing. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 11, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M00961774-S1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 18 days of being filed and a quarter take longer than 4 months, measured across 50,115 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M00961774-S1
- BBL
- 1010230029
- Postal code
- 10019 · 427 filings
- Review type
- Professional Certification
- Existing stories
- 23
- Proposed stories
- 23
- Existing dwelling units
- 665
- Proposed dwelling units
- 665