NYC DOB record · B00593061-I1

790 Greene Avenue

790 Greene Avenue, Brooklyn, NY 11221

Alteration filing in Bedford-Stuyvesant (East), Brooklyn. The latest DOB status is loc issued.

DOB has issued a Letter of Completion, which records that the work in this filing is finished. What every status means

Recorded as completedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 14, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · B00593061-I1

790 Greene Avenue

Brooklyn, NY 11221

Alteration filing · status dated Nov 5, 2021

Current record
Recorded as completed
Proposed scale
Not stated
Dwelling units
2
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing B00593061-I1 as a alteration filing at 790 Greene Avenue, Brooklyn, NY 11221. Its latest published status category is Recorded as completed, dated Nov 5, 2021. The filing records 2 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Recorded as completed
Latest status date
Nov 5, 2021
Proposed scale
2 proposed dwelling units
The building, not the filingEvery filing at BIN 3043980, with the parcel and violation recordApplicant of recordSee the 1019 filings that name Enthink Engineering LLC
FiledSep 16, 2021
Current recordRecorded as completed
Proposed scale2 units
Recorded cost$1,000

What the filing says

A public-record reading of the proposed work.

Proposed installation of temporary pipe scaffold as per plans. work shall comply with chapter #33 of the NYC building code. no change in use, occupancy, or egress under this application.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing B00593061-I1.

    01
  2. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    02
  3. Current status updated

    The latest recorded filing status is “LOC Issued.”

    03
  4. Sign-off date recorded

    DOB lists a sign-off date for this filing.

    04

For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 62,630 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
B00593061-I1
BBL
3016190043
Review type
Professional Certification
Existing stories
Empty in the source
Proposed stories
Empty in the source
Existing dwelling units
2
Proposed dwelling units
2
Scaffolding