NYC DOB record · M01376063-I1

799 Park Avenue

799 Park Avenue, Manhattan, NY 10021

Alteration filing in Upper East Side-Carnegie Hill, Manhattan. The latest DOB status is loc issued.

DOB has issued a Letter of Completion, which records that the work in this filing is finished. What every status means

Recorded as completedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Sep 13, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · M01376063-I1

799 Park Avenue

Manhattan, NY 10021

Alteration filing · status dated Sep 10, 2026

Current record
Recorded as completed
Proposed scale
21 stories
Dwelling units
77
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing M01376063-I1 as a alteration filing at 799 Park Avenue, Manhattan, NY 10021. Its latest published status category is Recorded as completed, dated Sep 10, 2026. The filing records 21 proposed stories and 77 proposed dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Recorded as completed
Latest status date
Sep 10, 2026
Proposed scale
21 proposed stories and 77 proposed dwelling units
Complete building dossierView all 3 filings associated with BIN 1043073Applicant of recordSee the 6 filings that name Conklin Costantin Architects LLP
FiledApr 6, 2026
Current recordRecorded as completed
Proposed scale21 stories
Recorded cost$15,000

What the filing says

A public-record reading of the proposed work.

Removal of non-structural partitions, wood flooring & carpet. installation of non structural partition. stone tile and carpet at apartment 14d . all as per plan. no change in use egress or occupancy.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 21-story elevator apartment building built in 1961, with 78 homes, on a 10,216 sq ft lot.

Built
1961
Floors
21
Residential units
78
Building type
Elevator apartment building
Land use
Elevator apartments
Zoning district
R10
Lot area
10,216 sq ft
Building area
148,485 sq ft
Historic district
Upper East Side Historic District

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 13, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 2 open notices on record for this building, out of 34 notices on file; the most recent was issued Jan 26, 2018.

  • (other bldgs types) - elevator affirmation of

    Issued Jan 26, 2018 — VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST

  • (other bldgs types) - elevator affirmation of

    Issued Jan 26, 2018 — VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST

A violation is a notice the Department of Buildings recorded against the building. It is not a judgment, and many concern paperwork rather than safety. Open means the agency has not recorded a resolution, which is not the same as the problem still existing. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 9, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing M01376063-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “LOC Issued.”

    04
  5. Sign-off date recorded

    DOB lists a sign-off date for this filing.

    05

For scale: half of DOB filings are permitted within 18 days of being filed and a quarter take longer than 4 months, measured across 50,115 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
M01376063-I1
BBL
1014090001
Review type
Standard Plan Examination
Existing stories
21
Proposed stories
21
Existing dwelling units
77
Proposed dwelling units
77
General construction