NYC DOB record · Q01262612-I1

80-15 251 Street

80-15 251 Street, Queens, NY 11426

Alteration filing in Bellerose, Queens. The latest DOB status is approved.

A plan examiner has approved the application. A permit still has to be issued before work can begin. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Nov 21, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · Q01262612-I1

80-15 251 Street

Queens, NY 11426

Alteration filing · status dated Nov 18, 2026

Current record
Approved
Proposed scale
Not stated
Dwelling units
1
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing Q01262612-I1 as a alteration filing at 80-15 251 Street, Queens, NY 11426. Its latest published status category is Approved, dated Nov 18, 2026. The filing records 1 proposed dwelling unit.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Nov 18, 2026
Proposed scale
1 proposed dwelling unit
Applicant of recordSee the 132 filings that name Anthony Cucich Architect
FiledOct 16, 2026
Current recordApproved
Proposed scale1 units
Recorded cost$65,000

What the filing says

A public-record reading of the proposed work.

Install plumbing fixture in existing one family building

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing Q01262612-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. Current status updated

    The latest recorded filing status is “Approved.”

    03

For scale: half of DOB filings are permitted within 23 days of being filed and a quarter take longer than 4 months, measured across 99,111 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
Q01262612-I1
BIN
4174551
BBL
4085640062
Review type
Standard Plan Examination
Existing stories
Empty in the source
Proposed stories
Empty in the source
Existing dwelling units
1
Proposed dwelling units
1