NYC DOB record · X01359147-I1

80 Erskine Place

80 Erskine Place, Bronx, NY 10475

Alteration filing in Co-Op City, Bronx. The latest DOB status is approved.

A plan examiner has approved the application. A permit still has to be issued before work can begin. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Aug 29, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · X01359147-I1

80 Erskine Place

Bronx, NY 10475

Alteration filing · status dated Aug 25, 2026

Current record
Approved
Proposed scale
6 stories
Dwelling units
Not stated
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing X01359147-I1 as a alteration filing at 80 Erskine Place, Bronx, NY 10475. Its latest published status category is Approved, dated Aug 25, 2026. The filing records 6 proposed stories.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Aug 25, 2026
Proposed scale
6 proposed stories
FiledJul 20, 2026
Current recordApproved
Proposed scale6 stories
Recorded cost$2.7M

What the filing says

A public-record reading of the proposed work.

Herewith filing for general construction and structural repairs to this existing parking garage. No change to use, occupancy or egress.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 6-story garage or fuel station built in 1969, on a 96,000 sq ft lot.

Built
1969
Floors
6
Residential units
0
Building type
Garage or fuel station
Land use
Parking facilities
Zoning district
R6
Lot area
96,000 sq ft
Building area
296,715 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 1, 2026. They describe the tax lot, not this filing.

Violation record

Are there open violations here?

The Department of Buildings has 4 open notices on record for this building, out of 26 notices on file; the most recent was issued May 27, 2022.

  • Construction

    Issued May 27, 2022 — EMERG WRK-FIRE OCCURED-2FL RAMP SW CORNER EFFECTING STRCTR ABOVE- 6 BAYS APPROX 100'X50' INCLD 3 CANTILEVERED AREAS&3 BACK SPANS CRACKD CONCRT RIBS & EXPOSED REBAR.3FL SLAB STRUCT COMPRMSD.OVERHD HAZ OWNR IMMED RETAIN NYSPE&CONTRCTR-EVAL COMPROMISD STRUCTR & DESGN&INSTL TEMP SHORNG/STBLILZTN.PE SBMT MEAN/METHOD TO FEU BY 5/31/22

  • Construction

    Issued May 27, 2022 — STRUCTURE RENDERED NON-COMPLIANT. AT TIME OF INSPECTION MINOR DAMAGE OBSERVED TO HAVE BEEN SUSTAINED TO 1ST THRU 3RD CONSISTING OF GLASS BLOCK WINDOWS, SCORCHING OF CEILING. MULTIPLE VEHICLES DAMAGED.

  • Construction

    Issued May 27, 2022 — FAILURE TO MAINTAIN BUILDING. AT TIME OF INSP OBSERVED AT SOUTH SIDE OF PARKING STRUCTURE AT 1ST THRU 3RD SEVERE CORROSION TO CONCRETE CEILING SLAB WHERE SECTIONS HAVE DETACHED EXPOSING STEEL RE-BAR. SEVERE HORIZONTAL/VERTICAL CRACKS WHERE WATER HAS PENETRATED COMPROMISING STRUCTURAL STABILITY. MULTIPLE AREAS SHOWS SEVERE SIGNS

  • 1 further open notice is on file. Open the source dataset for the full list.

Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing X01359147-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. Current status updated

    The latest recorded filing status is “Approved.”

    03

For scale: half of DOB filings are permitted within 20 days of being filed and a quarter take longer than 4 months, measured across 66,798 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
X01359147-I1
BIN
2072351
BBL
2051350090
Review type
Standard Plan Examination
Existing stories
6
Proposed stories
6
Existing dwelling units
0
Proposed dwelling units
0
General constructionStructural work