NYC DOB record · M01103383-I1

80 Pine Street

80 Pine Street, Manhattan, NY 10005

Alteration filing in Financial District-Battery Park City, Manhattan. The latest DOB status is permit entire.

DOB has issued the permit covering the full scope of this filing, so the work is cleared to proceed. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Nov 7, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · M01103383-I1

80 Pine Street

Manhattan, NY 10005

Alteration filing · status dated Nov 4, 2026

Current record
Approved
Proposed scale
39 stories
Dwelling units
Not stated
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing M01103383-I1 as a alteration filing at 80 Pine Street, Manhattan, NY 10005. Its latest published status category is Approved, dated Nov 4, 2026. The filing records 39 proposed stories.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Nov 4, 2026
Proposed scale
39 proposed stories
The building, not the filingopen housing violations, what it sold for, apartment sizes and every filing at BIN 1000880Applicant of recordSee the 1 filings that name Hatfield Groupd Engineering
FiledOct 11, 2024
Current recordApproved
Proposed scale39 stories
Recorded cost$3.4M

What the filing says

A public-record reading of the proposed work.

Exterior window removal and replacement on floors 2 through 17 only. no change in occupancy, use or egress. existing curtain wall system and spandrel glass to remain.

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 38-story condominium built in 1961, with 1418 homes, on a 48,946 sq ft lot.

Built
1961
Floors
38
Residential units
1418
Building type
Condominium
Land use
Mixed residential and commercial
Zoning district
C5-5
Lot area
48,946 sq ft
Building area
986,326 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 22, 2026. They describe the tax lot, not this filing.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing M01103383-I1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. First permit date recorded

    DOB lists a first permit date. This does not by itself confirm current construction activity.

    03
  4. Current status updated

    The latest recorded filing status is “Permit Entire.”

    04

For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 93,320 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
M01103383-I1
BBL
1000397502
Review type
Standard Plan Examination
Existing stories
39
Proposed stories
39
Existing dwelling units
0
Proposed dwelling units
0
General construction