What the filing says
A public-record reading of the proposed work.
Filing for Post Approval Amendment of suspended scaffold plan.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 6-story health facility built in 1967, on a 17,700 sq ft lot.
- Built
- 1967
- Last altered
- 1980
- Floors
- 6
- Residential units
- 0
- Building type
- Health facility
- Land use
- Public facilities and institutions
- Zoning district
- R7-2
- Lot area
- 17,700 sq ft
- Building area
- 68,787 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 23, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 15 open notices on record for this building, out of 55 notices on file; the most recent was issued Apr 9, 2026.
- Construction
Issued Apr 9, 2026 — FAILURE TO MAINTAIN WALLS AND APPURT. OBSERVED SPALLING/CRACKING CONCRETE BEAMS, EXPOSED REBAR, RUSTED REBAR, STEPCRACKS, LOOSE BRICKS, MISSING BRICKS, OPEN MORTAR JOINTS, DEFECTED MORTAR JOINTS AT EXPOSURE SOUTH ELEVATIONS. REMEDY: OWNER TO REPAIR AND/OR REPLACE
- Construction
Issued Sep 24, 2025 — FAILURE TO MAINTAIN BLDG IN CODE COMPLIANT MANNER AS PER NYC ADMIN CODE. OBSERVED @ EXP1 DAMAGED & DETERIORATED BRICK & MASONRY AT FOUNDATION LEVEL. OBSERVED @ ROOF BULKHEAD HAS STEP CRACKS AND SPALLING, EXPOSED AND DETERIORATED MASONRY. REMEDY: REPAIR AND/OR FIX
- Fail to certify class
Issued Jun 26, 2024 — FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
12 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 23, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M01274910-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 85,681 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M01274910-I1
- BIN
- 1064472
- BBL
- 1021800570
- Postal code
- 10040 · 92 filings
- Review type
- Standard Plan Examination
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- Empty in the source
- Proposed dwelling units
- Empty in the source








