NYC DOB record · X01217518-S1

802 Southern Boulevard

802 Southern Boulevard, Bronx, NY 10459

Alteration filing in Hunts Point, Bronx. The latest DOB status is approved.

A plan examiner has approved the application. A permit still has to be issued before work can begin. What every status means

ApprovedAlteration filing

NYC Department of Buildings · w9ak-ipjd · accessed Nov 8, 2026 · Verify the source row

Open full map
newyorkdailyStreet Futures

NYC DOB RECORD · X01217518-S1

802 Southern Boulevard

Bronx, NY 10459

Alteration filing · status dated Nov 6, 2026

Current record
Approved
Proposed scale
Not stated
Dwelling units
Not stated
Filing data portrait

A page-specific reading of the filing status, location and stated scale. Values are drawn from the cited DOB record.

Address record at a glance

What is filed at this address?

NYC DOB lists filing X01217518-S1 as a alteration filing at 802 Southern Boulevard, Bronx, NY 10459. Its latest published status category is Approved, dated Nov 6, 2026. The published record does not state proposed stories or dwelling units.

A filing or approval does not by itself confirm that work is underway. Proposed details may change in later DOB records.
Filing type
Alteration filing
Latest status
Approved
Latest status date
Nov 6, 2026
Proposed scale
Not stated in this filing
The building, not the filingEvery filing at BIN 2090437, with the parcel and violation recordApplicant of recordSee the 3 filings that name Core Environmental Consultants, Inc
FiledNov 4, 2026
Current recordApproved
Proposed scaleNot specified
Recorded cost$600,000

What the filing says

A public-record reading of the proposed work.

Install two (2) new 4,000-gallon double-wall frp underground fuel oil storage tanks serving existing boilers and emergency generator, and new veeder-root tls-450plus tank monitoring system. associated tank and existing monitoring system removals filed und

Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.

The lot this filing sits on

What is already here?

The lot holds a 2-story government property built in 1990, on a 46,790 sq ft lot.

Built
1990
Floors
2
Residential units
0
Building type
Government property
Land use
Public facilities and institutions
Zoning district
C8-3
Lot area
46,790 sq ft
Building area
40,708 sq ft

Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Nov 8, 2026. They describe the tax lot, not this filing.

Recorded timeline

Dates published by the Department of Buildings.

  1. Application filed

    DOB received filing X01217518-S1.

    01
  2. Application approved

    The application reached an approved status in the DOB record.

    02
  3. Current status updated

    The latest recorded filing status is “Approved.”

    03

For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 94,142 filings that carry both dates. How long a permit takes, by work type and borough

Scope and identifiers

The details used to match this filing.

Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.

DOB filing number
X01217518-S1
BBL
2027320001
Review type
Professional Certification
Existing stories
Empty in the source
Proposed stories
Empty in the source
Existing dwelling units
0
Proposed dwelling units
0