What the filing says
A public-record reading of the proposed work.
Repair minor fire damage to storefront facade.no change to use, egress or occupancy.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 5-story store building built in 1876, on a 1,623 sq ft lot.
- Built
- 1876
- Floors
- 5
- Residential units
- 0
- Building type
- Store building
- Land use
- Mixed residential and commercial
- Zoning district
- C5-1
- Lot area
- 1,623 sq ft
- Building area
- 7,258 sq ft
- Historic district
- Upper East Side Historic District
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 3, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 1 open notice on record for this building, out of 15 notices on file; the most recent was issued Jan 9, 2026.
- Construction
Issued Jan 9, 2026 — STRUCTURE RENDERED NON-COMPLIANT. OBSERVED DAMAGE SUSTAINED TO STORE FRONT FINISHES ALONG WITH HOLIDAY DECORATIONS DUE TO MINOR FIRE. NOTE ACTIVE FACADE REMEDIATION WORK AT 809 MADISON AVENUE WITH HIGH PRESSURE POWER WASHER EXCESSIVE WATER NEXT TO A POWER SOURCE.
A violation is a notice the Department of Buildings recorded against the building. It is not a judgment, and many concern paperwork rather than safety. Open means the agency has not recorded a resolution, which is not the same as the problem still existing. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 3, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing M01393445-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “Permit Entire.”
For scale: half of DOB filings are permitted within 18 days of being filed and a quarter take longer than 4 months, measured across 50,115 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- M01393445-I1
- BIN
- 1041248
- BBL
- 1013820150
- Postal code
- 10065 · 258 filings
- Review type
- Standard Plan Examination
- Existing stories
- 5
- Proposed stories
- 5
- Existing dwelling units
- 0
- Proposed dwelling units
- 0