What the filing says
A public-record reading of the proposed work.
Erect illuminated, accessory business wall sign-a with raceway on the diebond panels, no change to use, egress or occupation
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 4-story walk-up apartment building built in 1920, with 12 homes, on a 4,335 sq ft lot.
- Built
- 1920
- Floors
- 4
- Residential units
- 12
- Building type
- Walk-up apartment building
- Land use
- Mixed residential and commercial
- Zoning district
- C4-4A
- Lot area
- 4,335 sq ft
- Building area
- 20,203 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Sep 14, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 9 open notices on record for this building, out of 33 notices on file; the most recent was issued Jun 21, 2024.
- Immediate
Issued Jun 21, 2024
- Construction
Issued May 29, 2024 — EMERGENCY WORK ORDER DUE TO THE HAZARDOUS CONDITION OBSERVED AT EXP1,2 EAST,SOUTH ELEV:CRACKED MASONRY AT PARAPET LEVEL ON SE CORNER.THE HAZA RDOUS CONDITION EXISTS DIRECTLY ABOVE PUBLIC PATH OF SIDEWAK AT EXP1,2 EAST,SOUTH ELEV.REMEDY:IMMEDIATELY PROVIDE SAFETY MEASURES AND FIX/REP LACE DEFECTIVE CONDITIONS
- Construction
Issued May 29, 2024 — FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER. NOTE: OBSERVED AT EXP#1 (EAST ELEVATION) BROKEN WINDOW GLASS @ 2ND FLR; ALSO OBSERVED INADEQUATE AC SUPPORT AT 3RD FLR WINDOW SW CORNER OF EXP#2 (SOUTH ELEVATION.) REMEDY: FIX AND/OR REPLACE
6 further open notices are on file. Open the source dataset for the full list.
A violation is a notice the Department of Buildings recorded against the building. It is not a judgment, and many concern paperwork rather than safety. Open means the agency has not recorded a resolution, which is not the same as the problem still existing. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Sep 14, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing B00510623-I1.
- First permit date recorded02
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated03
The latest recorded filing status is “LOC Issued.”
- Sign-off date recorded04
DOB lists a sign-off date for this filing.
For scale: half of DOB filings are permitted within 18 days of being filed and a quarter take longer than 4 months, measured across 50,115 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- B00510623-I1
- BBL
- 3027840021
- Postal code
- 11211 · 2687 filings
- Review type
- Professional Certification
- Existing stories
- Empty in the source
- Proposed stories
- Empty in the source
- Existing dwelling units
- 12
- Proposed dwelling units
- 12








