What the filing says
A public-record reading of the proposed work.
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the NYC building code. live load 300psf.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 3-story store building built in 1925, with 4 homes, on a 17,200 sq ft lot.
- Built
- 1925
- Last altered
- 2023
- Floors
- 3
- Residential units
- 4
- Building type
- Store building
- Land use
- Commercial and office
- Zoning district
- R6
- Lot area
- 17,200 sq ft
- Building area
- 35,438 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 16, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 11 open notices on record for this building, out of 20 notices on file; the most recent was issued Nov 14, 2025.
- Low pressure boiler
Issued Nov 14, 2025 — VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
- Construction
Issued Jun 27, 2025 — FTC W/COMMISSIONER'S ORDER CONTROL#348207 VIO#050125PI40403SB DATED 05/01/25 REQUIRING OWNER TO SUBMIT A CORRECTIVE ACTION PLAN W/IN 30 DAYS FROM DATE OF P.I INSP. AS OF TODAY 06/27/25 A CORRECTIVE ACTION PLAN WAS NOT REC'D. IMMED COMPLY W/COMMISSIONER'S ORDER CONTROL#348207 VIO#050125PI40403SB TO SUBMIT CORRECTIVE ACTION PLAN
- Construction
Issued May 1, 2025 — CORRECTION ACTION PLAN REQ'D. OBSVD @ EXP1 BULGING BRICKS @ THE CORNER OF THE LINTELS ON 2FL. @ EXP2/3 OBSVD CRACKED/BULGING STUCCO IN THE SHARED COURTYARD. OWNER TO IMMED RETAIN REG DESIGN PROF TO EVAL THE ENTIRE BLDG & TO SUBMIT CORRECTIVE ACTION PLAN W/IN 30 DAYS ADDRESSING ALL COND WITH PLAN,PHOTOS,RECOMMENDING TIME FRAME & REPAIRS T/BE COMPL
8 further open notices are on file. Open the source dataset for the full list.
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 16, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing Q01462609-I1.
- Application approved02
The application reached an approved status in the DOB record.
- Current status updated03
The latest recorded filing status is “Approved.”
For scale: half of DOB filings are permitted within 22 days of being filed and a quarter take longer than 4 months, measured across 81,398 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- Q01462609-I1
- BIN
- 4449561
- BBL
- 4014930003
- Postal code
- 11372 · 190 filings
- Review type
- Standard Plan Examination
- Existing stories
- 2
- Proposed stories
- 2
- Existing dwelling units
- 12
- Proposed dwelling units
- 10








