What the filing says
A public-record reading of the proposed work.
Removal permit for illuminated signs and non-illuminated awning signage. no change of use, egress or occupancy.
Street Futures classifies this record as a alteration filing based on the filing type and work flags published by the Department of Buildings. This classification helps organize the map; it does not add scope that is absent from the DOB record.
The lot this filing sits on
What is already here?
The lot holds a 3-story store building built in 1925, with 4 homes, on a 17,200 sq ft lot.
- Built
- 1925
- Last altered
- 2023
- Floors
- 3
- Residential units
- 4
- Building type
- Store building
- Land use
- Commercial and office
- Zoning district
- R6
- Lot area
- 17,200 sq ft
- Building area
- 35,438 sq ft
Lot facts come from NYC Department of City Planning, Primary Land Use Tax Lot Output (PLUTO) (64uk-42ks), accessed Oct 10, 2026. They describe the tax lot, not this filing.
Violation record
Are there open violations here?
The Department of Buildings has 2 open notices on record for this building, out of 9 notices on file; the most recent was issued Aug 5, 2025.
- Construction
Issued Aug 5, 2025 — CORRECTIVE ACTION PLAN REQ'D.OBSVD @ EXP2/3 CRACKED/BULGING STUCCO IN THE SHARED COURTYARD @ EXP1 OBSVD BULGING MASONRY @ 2FL ABOVE THE LINTEL & SOME DETERIORATED MORTAR JOINTS.IMMED COMPLY W/COMMISSIONER'S ORDER 348209 & 050125PI404-5SB TO PROVIDE A CORRECTIVE ACTION PLAN REPR BLDG UNDER PERMIT
- Construction
Issued May 1, 2025 — CORRECTION ACTION PLAN REQ'D OBSVD @ EXP2/3 CRACKED/BULGING STUCCO IN THE SHARED COURTYARD.@ EXP1 OBSVD BULGING MASONRY @ 2FL ABOVE LINTEL & SOME DETERIORATED MORTAR JOINTS. OWNER TO IMMED RETAIN A REG DESIGN PROF TO EVAL ENTIRE BLDG & SUBMIT CORRECTIVE ACTION PLAN TO PROACTIVEINSP@BUILDINGS.NYC.GOV W/IN 30 DAYS ADRESSING ALL CONDITIONS
Open means the agency has not recorded a resolution, which is not the same as the problem still existing. What a violation is, and what it is not. From NYC Department of Buildings, DOB Violations (3h2n-5cm9), accessed Oct 10, 2026.
Recorded timeline
Dates published by the Department of Buildings.
- Application filed01
DOB received filing Q01438796-I1.
- Application approved02
The application reached an approved status in the DOB record.
- First permit date recorded03
DOB lists a first permit date. This does not by itself confirm current construction activity.
- Current status updated04
The latest recorded filing status is “LOC Issued.”
- Sign-off date recorded05
DOB lists a sign-off date for this filing.
For scale: half of DOB filings are permitted within 21 days of being filed and a quarter take longer than 4 months, measured across 78,679 filings that carry both dates. How long a permit takes, by work type and borough
Scope and identifiers
The details used to match this filing.
Where a field reads “empty in the source”, the city published this filing without that value. It is not an omission on our side, and nothing here is inferred to fill a gap.
- DOB filing number
- Q01438796-I1
- BIN
- 4449564
- BBL
- 4014930003
- Postal code
- 11372 · 177 filings
- Review type
- Professional Certification
- Existing stories
- 3
- Proposed stories
- 3
- Existing dwelling units
- 7
- Proposed dwelling units
- 7








